ProfileFavorites
Cart
The Artling Logo

LeaderBy Huang Yulong

Favorite
Find Similar

Exclusive to The Artling

Loading

US$ 8,300


Overview

2010

Porcelain, Porcelain

Suitable for Outdoor Use

Unique Work

Dimensions: 53cm (H) x 18cm (W) x 18cm (D) / 20.9" (H) x 7.1" (W) x 7.1" (D)

Note: Actual colours may vary due to photography & computer settings.


Shipping

This item ships from China

Please note that this item requires crating for shipment


In partnership with

Logo of gallery Art+ Shanghai Gallery

Buy With Confidence
Info

Collect from reputable artists and galleries

Ships securely to your door

Certificates of Authenticity with each artwork


Artist Statement

Yulong's works in a variety of media, mixing traditional ceramic porcelain or bronze with crystals. To him, the hip-hop culture he often portrays, the hoodies and bling, is a state of being and a way of life, not merely a foreign culture appropriated by young Chinese. To him, hip-hop culture is “characterized by energy, power, purity, sexuality, freedom, courage. But this is also an urban story full of crying and blood.”

 



Artist Profile

Born: 1983
Hometown: Anhui Province
Based in: Beijing

Huang Yulong (⻩玉龙) was born in 1983 in Anhui Province, China. In 2007 he graduated with a Bachelor of Fine Arts in Sculpture from the Jingdezhen Ceramic Institute in Jiangxi Province. As one of the new generation of Chinese sculpture artists and part of the post-‘80 and ‘only child’ generation, …

 

Visit Artist Profile Page

Back to Top